01
Rules of the phased planning of works that have become the basis for the scheduling, actualization, analysis and control of the investment projects.
|
02
Schedule templates for all the phases of an investment project, including directive schedule (first-level schedule), complex schedule (second-level schedule), milestones plan.
|
03
Annexes to CJSC “EUROCEMENT” standard contracts in such kind of activities as processing-survey works, logistics, building and assembly works, commissioning. The documents were included in the methodology of planning and accounting of the treaty obligations.
|
04
Rules of hierarchic categorization of the customer’s resources.
|
Construction planning specifics was introduced into normative-methodical documents taking the LMP Project Group specialists’ real production experience into account;
|
Ready-made templates allowing to simplify the process of multi-leveled scheduling for new projects were provided;
|
All methodologic documentation was prepared in time and delivered to the customer.
|
LMP Project Group’s participation in the project provided effective cooperation of the consultants in the area of the implementation of the information systems for managing projects and current planning engineers. It provided an opportunity to create an effective and viable customer’s scheduling system.